CAVU Aerospace UK Ltd

TCU, Thermal Control Unit, Thermal Control

THERMAL CONTROL UNIT - ( TCU )

Thermal Management For Satellite Systems

PIONEERING SPACECRAFT COMPUTING

The CAVU TCU offers efficient thermal management for satellite systems, ensuring reliable performance in space. Using FPGA-based control and radiation mitigation techniques, it optimizes power use for long-duration missions with customizable sensor inputs and heater channels.

KEY FEATURES

  • Supports 110 sensor inputs, 50 heaters output
  • FPGA-based control with SEU mitigation
  • Real-time thermal monitoring and adjustment
  • Interface to Thermistors, RTD, etc.
  • Fully Customizable

INTERFACES

  • Temperature Sensor Input: 110 Analog Input Channels
    • Thermistor
    • RTD
    • Custom Analog
  • Heater Driver Output: 50CH Up to 50W Each
  • Digital GPIO:
    • 8 Inputs / 8 Outputs
  • Serial Interfaces:
    • CAN2.0: 2
    • RS422: 2
    • RS485: 1
    • RS232:1

ENVIRONMENT

  • Radiation Hardness:
    • Total Ionizing Dose: 30Krad
    • Latch-up Immune
    • SEE @ 60MeV
  • Temperature & Pressure: -40 C to +85 C @ 10-8 bar
  • Shocks: 2000g, 2000-10000Hz
  • Random Vibrations: 14g(RMS) 3-Axis , 20~2000Hz

MEMORY

  • RAM: 80Mbits MRAM 40 bits width
  • ROM: 80Mbits MRAM 40 bits width
  • Nonvolatile Flash Memory:
    • Total 32Gbit SLC NAND
    • 256K Serial FRAM
    • 256M Serial NOR

BUDGET

  • Dimensions: 160x170x38mm
  • Mass: 1.1Kg
  • Power Supply: 28V ±4V, Custom Range Available
  • Power Consumption: 1.5W ~ 4W

PRODUCT DOCUMENTS

TCU is flight proven onboard computer for number of satellite projects and we have full ECSS/ NASA documentation documents & test reports.

  • Failure Modes, Effects, and Criticality Analysis (FMECA)
  • Reliability Analysis Report
  • Radiation Analysis Report
  • Safety Assurance Plan
  • Fault Tree Analysis (FTA)
  • Single Point Failure Analysis (SPFA)
  • Worst Case Analysis (WCA)
  • Derating Analysis Report
  • Availability Analysis Report
  • Mechanical Analysis Report
  • Maintainability Analysis Report
  • Fault Detection, Isolation, and Recovery (FDIR)
  • Qualification Test Plan (QTP)
  • Environmental Test Reports, TVAC, Vib.
  • EMC/EMI Test Report
  • Radiation Test Report
  • Operational Risk Assessment (ORA)
  • Critical Items List (CIL)
  • Materials, Processes, and Mechanical Parts List (MPMPL)
  • Product Assurance Plan (PAP)
  • Configuration Item Data List (CIDL)
  • End Item Data Package (EIDP)
  • As-Built Configuration List (ABCL)

TCU EMC, Thermal Control Unit, Thermal Control

EMC TCU, Thermal Control Unit, Thermal Control